
Impact damage repairs to blockwork are typical of the kind of work dilapidation repairs we undertake. In this instance the blockwork panels were badly damaged along their whole length and varying heights. The panels were approximately 20m high and clad one side which made it difficult to safely repair the whole panel in one go without removing the metal cladding. The repairs had to made in 1.5m sections and supported from one side with Acrow props and Strongboys.