Foul Drainage Connection

Posted by Terry J on 24 May 2010

Tags: , , , , , , , ,

Building Regulation DrawingATJ Building & Groundworks regually install new drain runs, man holes and been carrying out Drainage Repairs in Northamptonshire and Bedfordshire for many years, This particular job was  to make  nessary drainage alterations  to connect the clients property onto the mains sewer rather than a ses pit which wasn't working properly and becoming a hazard. When the village was recently developed and Anglian Water installed spurs from the main sewer to inside the our clients boundary along with every other property on their street.

Read the full post

Block Paving Forecourt

Posted by Terry J on 24 May 2010

Tags: , , , , , ,

Proposed Block Paving Car DisplayATJBuilding & Groundworks undertake comercial Block Paving contracts in Northampton, Milton Keynes, Kettering Wellingbrough and Corby. This particular job to create a block paved area for Kia Garage to display a new model cars.

Read the full post